Research on Characters and Reinforcement of Silt on the Bottom of Stone Tongue Formed by Reclamation Silt

2013 
Drum-shaped stone tongue that there are 3 ~ 5 m thick wedge silt on the bottom formed in the junction of silt and the stone embankment by reclamation silt with mountain stone during the course of backfill. In the paper, on the basis of drills, superficia drilling holes, deep drilling holes and vibrating stop plank model, boundary stone embankment shape and soft soil layer depth were obtained, cross section of stone embankment and stone embankment boundary were revealed during the course of artificial fill, study the stone tongue shape, soft soil around stone tongue, silt characters on stone tongue bottom and reinforcement treatments were studied to obtain treatment method which can satisfy the engineering requirement and can save the engineering cost and provide mature construction technology and method for the similar subgrade treatment of sea reclamation engineering.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []