Análisis de Costos Nivelados de Electricidad de Plantas de Cogeneración usando Biomasa Forestal en el Departamento de Antioquia, Colombia

2019 
espanolEn este trabajo se analizan los efectos de los incentivos tributarios de la Ley 1715 de 2014 (Ley colombiana de energias renovables) en el costo nivelado de electricidad (CNE) de plantas de generacion de energia con biomasa forestal en el departamento de Antioquia. Con base en el potencial energetico de la biomasa se consideraron las tecnologias de gasificacion, combustion y ciclo organico Rankine (ORC). Se analizaron tres casos de estudio: 1) CNE sin incentivos, 2) CNE con incentivos y 3) CNE con incentivos, considerando una depreciacion de activos a 10 anos. Por otro lado, se realizo un analisis de sensibilidad para evaluar la variacion en el CNE por cambios en el costo de la biomasa forestal, el costo de la tecnologia de generacion, la tasa minima aceptable de rentabilidad y el periodo de gracia en los creditos para financiar las plantas. Finalmente, los resultados obtenidos muestran que el CNE del ORC (13,2 ¢U$/kWeh) es el que presenta mayor reduccion (11,2%), cuando se consideran los incentivos de la Ley 1715 de 2014 con depreciacion de activos a 10 anos, financiacion del 50% de la inversion inicial y periodo de gracia a 5 anos. EnglishIn this paper the effects of the tax incentives of the Law 1715 of 2014 (Colombian law of renewable energies) on the levelized cost of electricity (LCOE) of cogeneration plants using forest biomass in the Antioquia Department are analyzed. Generation technologies such as Gasification, Combustion and Rankine Organic Cycle (ORC) were considered based on the energy potential of the forest biomass crops. Three study cases were carried out: 1) LCOE without tax incentives, 2) LCOE with tax incentives, and 3) LCOE with tax incentives considering ten years for assets depreciation. On the other hand, a sensitivity analysis was carried out to evaluate how the LCOE is affected due to changes in the forest biomass cost, the technology cost, the minimum acceptable return rate and the grace period on credits to finance the cogeneration plants. Finally, the results show that the LCOE with the ORC (13,2 ¢U$/kWeh) is the case with the greatest reduction (11,2%), when the incentives of Law 1715 of 2014 with assets depreciation at 10 years, financing the 50% of the initial investment and grace period for 5 years are considered.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    4
    Citations
    NaN
    KQI
    []