Perencanaan Sinyal Lampu Lalu Lintas Persimpangan Tiga Lengan Pada Jl.Tanjung Raya II – Jl. Panglima Aim Kota Pontianak

2015 
Abstract– This study aim to plan traffic light at intersection three arm of Tanjung Raya II Street – Panglima Aim Street in Pontianak City. This Study require data of intersection geometric and vehicle traffic obtained of field survey. This study yield planning of traffic light 2 phase with cycle time 78 second. Green time of actual for phase 1 (Street of Panglima Aim) equal to 22 second, and for phase 2 ( Sreet of Tanjung Raya II) equal to 42 second. Keywords– Traffic Light, Cycle Time, Green Time .
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []