Perencanaan Sinyal Lampu Lalu Lintas Persimpangan Tiga Lengan Pada Jl.Tanjung Raya II – Jl. Panglima Aim Kota Pontianak
2015
Abstract– This study aim to plan traffic light at intersection three arm of Tanjung Raya II Street – Panglima Aim Street in Pontianak City. This Study require data of intersection geometric and vehicle traffic obtained of field survey. This study yield planning of traffic light 2 phase with cycle time 78 second. Green time of actual for phase 1 (Street of Panglima Aim) equal to 22 second, and for phase 2 ( Sreet of Tanjung Raya II) equal to 42 second. Keywords– Traffic Light, Cycle Time, Green Time .
- Correction
- Source
- Cite
- Save
- Machine Reading By IdeaReader
0
References
0
Citations
NaN
KQI