Displacement Monitoring and Analysis of Tunnel Construction

2007 
In order to grasp the changing regulations of circumference convergence and internal displacement of tunnel,the displacement monitoring of initial support and secondary lining is done using SW-VI convergence gauge and three-point displacement meter.The results show that the average velocity of testing sections is less than basic stabilization criterion,and reveals the working status of tunnel support structure is better.