Construction of setting concrete frame columns steel Bracket
2013
The present invention relates to a frame construction method for a concrete pillar disposed steel corbel comprising the steps of: forming steel banding steel skeleton; at least four fixing screws embedded in at least one side of the reinforcement cage according to the design elevation, the embedded the end of the screw to be spot-welded to the reinforcement of the reinforced backbone secured, the other end of the embedded screw is exposed outside the steel skeleton; the template is mounted on the outside of the steel frame, the embedded screw of the template are exposed outside the protective tape partially wound; pouring concrete in the steel skeleton; after the concrete has attained the strength of the design, removal of the template, forming the concrete frame column; mounted on the steel frame concrete column corbel, has a plurality of laterally adjustable bolt holes on the corbels steel, the steel corbel adjusted by the bolt hole may be fixed to the embedded screw.
Keywords:
- Correction
- Source
- Cite
- Save
- Machine Reading By IdeaReader
0
References
0
Citations
NaN
KQI