Construction of setting concrete frame columns steel Bracket

2013 
The present invention relates to a frame construction method for a concrete pillar disposed steel corbel comprising the steps of: forming steel banding steel skeleton; at least four fixing screws embedded in at least one side of the reinforcement cage according to the design elevation, the embedded the end of the screw to be spot-welded to the reinforcement of the reinforced backbone secured, the other end of the embedded screw is exposed outside the steel skeleton; the template is mounted on the outside of the steel frame, the embedded screw of the template are exposed outside the protective tape partially wound; pouring concrete in the steel skeleton; after the concrete has attained the strength of the design, removal of the template, forming the concrete frame column; mounted on the steel frame concrete column corbel, has a plurality of laterally adjustable bolt holes on the corbels steel, the steel corbel adjusted by the bolt hole may be fixed to the embedded screw.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []