Functional requirements for Waste Area Grouping 6 Monitoring Station 3 upgrade

1991 
The surface Waste Area Grouping (WAG)6 at ORNL may undergo many changes in the future as part of the closure activities. Changes in surface characteristics will cause changes in runoff characteristics of the MS 3 watershed. Appropriate assumptions are to be made in this project regarding the future surface conditions of the watershed. The extent to which the assumed surface conditions will affect the project objectives (defined in Section 1.0) is to be identified. The purpose of this FRD is to establish performance requirements for MS 3 consisting of the following: (1) The expected range of discharges passing through the station and the required accuracy levels for discharge measurements. (2) The equipment required to measure the expected discharges at the required accuracy levels. (3) The sampling requirements for monitoring water quality. (4) The hydraulic requirements for the discharge conveyance structure to be located under the IWMF access road. (5) The design loads to be used for the bridge over the IWMF access road. 12 refs., 5 figs.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []