Feasibility study of a feed-forwarding voltage-reactive power control method based on linear programming for a central control facility

1998 
Voltage–reactive power control (VVC) on power systems becomes difficult when a load increases or decreases rapidly, especially in the morning and at noon. This is caused mainly by two problems. One is delayed operation and the other is noncooperative operation of facilities. To solve these problems, an advanced method and algorithms for a centralized feed-forwarding control system are presented. They are based on two main steps: forecasting the power system state for several minutes and dispatching reactive power sources optimally based on stepwise linear programming. The proposed method is evaluated and tested for data of a large-scale power system. The results show that the proposed method keeps the voltage constraints well and reduces redundant operation of facilities. © 1998 Scripta Technica, Electr Eng Jpn, 125(1): 18–26, 1998
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []