Identification of Critical Factors Affecting Flexibility in Hospital Construction Projects

2010 
Objective:This paper analyzes the dynamics relating to flexibility in a hospital project context. Three research questions are addressed: (1) When is flexibility used in the life cycle of a project? (2) What are the stakeholders' perspectives on project flexibility? And (3) What is the nature of the interaction between flexibility in the process of a project and flexibility in terms of the characteristics of a building?Background:Flexibility is discussed from both a project management point of view and from a hospital architecture perspective. Flexibility in project life cycle and from a stakeholder perspective is examined, and the interaction between flexibility in scope lock-in and building flexibility is investigated.Methods:The results are based on case studies of four Norwegian hospital projects. Information relating to the projects has been obtained from evaluation reports, other relevant documents, and interviews. Observations were codified and analyzed based on selected parameters that represent d...
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    20
    References
    11
    Citations
    NaN
    KQI
    []