Topping the 300-MW power unit at the GRES-24 district power station with a GTE-110 gas turbine unit. Technical solutions on the thermal circuit

2010 
We describe the outcomes from the development of a gas-turbine topping for the 300-MW power unit that was initially constructed as an attachment to an MHD-generator, which, however, has not been constructed. A 110-MW GTE-110 gas-turbine unit was used as a topping for this power unit. The topped power unit allows more than 9% of fuel to be saved as compared with the original one.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []