- black starting system and method for an island city-based multi-agent network

2013 
An urban island grid black start system and method for multi-agent based, belongs to the field of power system operation and control. Plural sets of pre-configured in the main power plant unit may be implemented splitting islanding operation, which requires the unit to assume their plant after power load, and ability to supply a second load or to provide additional capacity to start the plant, when the emergency dumped after loading the stable operation of power plants can protect themselves; when the grid system is subject to large disturbances or major failure, monitored agent will take the initiative to de-fitted to run island state of substation monitoring agent in the affected areas, power plants, when the fault finally evolved after the blackout, all the grid power plants and substations grade level island and stable operation of the respective operating conditions of the island grid monitoring center to report to the agent. The present invention can greatly reduce the time grid black start and reduce economic losses and social impacts caused by power failure.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []