Design and Implementation of the Integrated Test Platform for the Hydraulic Components

2012 
In this paper, a new type of hydraulic test bed is developed which can be used for performance testing of hydraulic valves, hydraulic motor and hydraulic pump. The composition structure diagram of hydraulic system, power supply system, and the signal flow diagram of data acquisition system were designed. The characteristics of the LabWindows/CVI development tools and the usage of Prodave MPI/IE 6 network communication tools were introduced, also the database storage and access technology in LabWindows/CVI environment. It was proved through the practical application that the test bed is reliable and has the merit of higher precision and automation level, and simple operation.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    2
    References
    0
    Citations
    NaN
    KQI
    []