Progress of the RAON
2018
Construction of the RAON heavy ion accelerator facility is in-progress in Korea. The driver linac is a superconducting linac with 200 MeV/u for uranium beam and 400 kW beam power. Prototyping of major components and their tests are proceeding including superconducting cavities, superconducting magnets and cryomodules. December 2016, the RFQ accelerated oxygen beam. Status report of the RAON accelerator systems is presented.
Keywords:
- Correction
- Source
- Cite
- Save
- Machine Reading By IdeaReader
2
References
1
Citations
NaN
KQI