Rapid Installation Technology of Fully Mechanized Mining Equipment in Steeply Inclined Longwall Face Along Strike

2015 
Aiming at the problems in fully mechanized coal mining equipment installation in steeply inclined longwall working face along strike,such as complicated steel girder hoisting process and harsh adaption conditions,flat car derail and equipment rollover.Slideway was installed in open- off,transport platform was built upper,and winch speed control,piston shoes guide and horizontal self- slip of the equipment were applied,to ensure smooth transportation and improve the safety coefficient,simplify the process and reduce personnel and man hour,accelerating installation speed and reducing labor intensity and the cost.