Evaluation of implementation, enforcement and compliance issues of the Bonneville Model Conservation Standards Program: Volume 2: Technical report and appendices
1989
This technical report expands several issues raised in Volume 1 of the Early Adopter program evaluation. These issues were important to the analyses of Volume 1, but their explanations involved more detail than was necessary for the general reader. Therefore, rather than relegate the issues to a technical appendix or refer the reader to other sources of the information, we decided to address them in a separate technical report. In the following sections, we discuss: (1) an analysis of opportunity and accounting costs; (2) detailed infiltration results; and (3) the electricity simulation models. 4 refs., 3 figs., 8 tabs.
Keywords:
- Correction
- Source
- Cite
- Save
- Machine Reading By IdeaReader
0
References
0
Citations
NaN
KQI