language-icon Old Web
English
Sign In

SARAF Phase I linac in 2012

2014 
This report outlines the status of beam operations at the SARAF accelerator during 2012. Performance of various accelerator subsystems, their limiting factors and the recent improvements are presented. The accumulated experience of proton beam operation is summarized. Future prospects are discussed.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    4
    References
    9
    Citations
    NaN
    KQI
    []