Field Tests of Post Grouted Concrete Piles
2021
With the soaring requirement of building space in metropolises, high rise building development is indispensable and thus deep piles are imperative. Pile length can range from 20 to 60 m due to large loads from upper structures needing to be transferred into soils.
- Correction
- Source
- Cite
- Save
- Machine Reading By IdeaReader
23
References
0
Citations
NaN
KQI