Department of Energy decontamination and decommissioning project experience

1994 
An integrated risk-based approach has been developed to address the human health risks of radiological and chemical releases from potential facility accidents in support of the U.S. Department of Energy (DOE) Environmental Restoration and Waste Management (EM) Programmatic Environmental Impact Statement (PEIS). Accordingly, the facility accident analysis has been developed to allow risk-based comparisons of EM PEIS strategies for consolidating the storage and treatment of wastes at different sites throughout the country. The analysis has also been developed in accordance with the latest DOE guidance by considering the spectrum of accident scenarios that could occur in implementing the various actions evaluated in the EM PEIS. The individual waste storage and treatment operations and inventories at each site are specified by the functional requirements defined for each waste management alternative to be evaluated. For each alternative, the accident analysis determines the risk-dominant accident sequences and derives the source terms from the associated releases. This information is then used to perform health effects and risk calculations that are used to evaluate the various alternatives.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []