Plutonium demonstration assemblies in the CNA core

1975 
The SENA (Societe d'Exploitation Nucleaire des Ardennes) has decided to load two plutonium assemblies at the beginning of the 6th cycle of the CNA (Centrale Nucleaire des Ardennes). These assemblies will be loaded in September 1975 and will undergo three irradiation cycles. A general description of these two assemblies and nuclear design calculations that have been performed are presented. (FR)
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []