공사계약서 약정항목별 공사대금 소송확률에 관한 다중 로지스틱 회귀 모형 연구 - 소규모 민간건설공사 중심으로 -

2021 
Making a contract of small private construction works is very often disregarded important or subsidiary contract details which strongly recommended in standard contract sheet. To have a well fulfilled contract sheet with detailed agreements are very symbolic to promising their rights and obligations to each other until they meet the final objectives of completion, delivery, and receipt of construction payments. Therefore, a almost perfect contract give us less disputes for payments during construction or after completion of work. In this study, a logistic regression model was used to determine the effect of subcontract items from survey. The results show that contract sheet, design alternation and cancellation of contract are the most important contract conditions, and derived a logistic regression model for reducing a dispute between both personal contract.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []