Column configuration anchorage positioning construction method

2013 
The present invention relates to a construction method, in particular to a configuration of the column positioned anchorage construction method. Construction steel column anchorage solve existing problem of inaccurate positioning, provide a structural column anchorage positioning construction method. After the reinforced concrete beam and the template is installed, ready for concrete pouring front, bottom mold for beam cleanup, Surveying, configured to determine the position of the column, with red paint applicator is positioned in the beam bottom mold, pouring the concrete, form removal The red paint drilling position, hole cleaning, dispensing, anchorage, curing, protecting and acceptance. Compared with the prior art, key aspect of the present invention is installed in a reinforced concrete beam and the template, prior to preparation for concrete pouring. Using U-shaped steel reinforcement jig according to a position corresponding to the position of the beam structural column bottom die, with a red paint applicator positioning. You can avoid open within the steel beam. After the end of the concrete beam mold to be removed and drilling in accordance with red paint anchorage positions corresponding to the end of the concrete beam, one can ensure anchorage place.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []