A model for the cost of doing a cost estimate

1992 
A model for estimating the cost required to do a cost estimate for Deep Space Network (DSN) projects that range from $0.1 to $100 million is presented. The cost of the cost estimate in thousands of dollars, C(sub E), is found to be approximately given by C(sub E) = K((C(sub p))(sup 0.35)) where C(sub p) is the cost of the project being estimated in millions of dollars and K is a constant depending on the accuracy of the estimate. For an order-of-magnitude estimate, K = 24; for a budget estimate, K = 60; and for a definitive estimate, K = 115. That is, for a specific project, the cost of doing a budget estimate is about 2.5 times as much as that for an order-of-magnitude estimate, and a definitive estimate costs about twice as much as a budget estimate. Use of this model should help provide the level of resources required for doing cost estimates and, as a result, provide insights towards more accurate estimates with less potential for cost overruns.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    3
    Citations
    NaN
    KQI
    []