Settlement Obsevation and Analysis on the Engineering Bridge Pier Under High Speed Railway

2013 
With the Shanghai Kunming high-speed rail project as the background,the Shanghai Kunming high-speed rail bridge pier view mark setting,settlement observation technical requirements and methods of observation are introduced.The Shanghai Kunming high-speed rail bridge pier settlement data are analyzed,indicating pier is stable.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []