Verification of structural integrity and cooling performance of DRCS cabinet in power plant
2020
The digital rod control system (DRCS) is an important component in nuclear power plants. Thus, the structural integrity of the isolation cabinet of the DRCS should be verified, considering the seis...
Keywords:
- Correction
- Source
- Cite
- Save
- Machine Reading By IdeaReader
3
References
1
Citations
NaN
KQI