Hybrid Energy Storage System for GSHP Black Start

2014 
This document researchs on 55kW GSHP black start based on 250kW/250kWh battery system and 50kW/10s super capacitor. The modeling methods of asynchronous motor, battery system, super capacitor and PCS are given. According to three black start conditions: direct start, star delta start and frequency conversion start, simulates and analyses the results. During black start, the max AC bus voltage drop reaches 60%, and hybrid energy storage system is able to effectively inhibit the inrush current.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    6
    References
    1
    Citations
    NaN
    KQI
    []