Reinforcement design and construction monitoring for on-track tower crane in Xinqiao International Airport
2010
In view of the complex long span structure in the third area of the first-stage terminal building of Xinqiao International Airport,the paper proposes a foundation reinforcement scheme for on-track tower crane,and the whole hoisting process is monitored.The result shows that reasonable reinforcement design can ensure the stability and safety of the steel truss hoisting process.The study may offer a good reference for similar construction.
Keywords:
- Correction
- Source
- Cite
- Save
- Machine Reading By IdeaReader
0
References
0
Citations
NaN
KQI