Technical and economic feasibility for the application of micronized coal as a replacement for No. 2 oil for start-up and low-load operation at Illinois Power Havana No. 6 Cycling Unit
1991
Uncertainty regarding oil availability and long-term price stability make it difficult for a utility to predict annual ignition costs for a cycling unit. Illinois Power Company, Sargent and Lundy Engineering and Micro-fuel Corporation have produced a detailed feasibility study on the application of micronized coal as a replacement fuel for start-up and low-load operation for Havana No. 6. This unit is a B and W opposed-fired boiler which is rated at 410 MWe (summer net). This paper presents technical and economic analysis, including the uncertainties of the application of this technology.