Handling a scheduling request activator

2010 
A method in a computer (120) user manipulation of a trigger scheduling request, comprising equipment (120) user a buffer (900), the method comprising: receiving (501) data to transmit to a base station (110), data coming into the buffer (900), generating (502) a trigger report buffer status, generating activator report buffer status that is activated by the data arrived, generating (503) an activator scheduling request activator scheduling request is pending until annulled, and whose generation is activated by the generation activator report buffer status, which in turn was activated by the data arrived; characterized in that the method comprises: sending a scheduling request if the buffer (900) comprises data have not yet been taken into account in a report buffer status and that are not included in a currently planned data transmission uplink.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []