Absolute measurement of the 1S0 - 3P0 clock transition in neutral 88Sr over the 330 km-long stabilized fibre optic link.

2015 
Absolute measurement of the 1 S 0  −  3 P 0 clock transition in neutral 88 Sr over the 330 km-long stabilized fibre optic link
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    31
    References
    43
    Citations
    NaN
    KQI
    []