ELECTRICAL QUALITY ASSURANCE OF THE SUPERCONDUCTING CIRCUITS DURING LHC MACHINE ASSEMBLY
2008
1 , O. Desebe 1 , K-H. Mess Based on the LHC powering reference database, all-together 1750 superconducting circuits were connected in the various cryogenic transfer lines of the LHC machine. Testing the continuity, magnet polarity, and the quality of the electrical insulation were the main tasks of the Electrical Quality Assurance (ELQA) activities during the LHC machine assembly. With the assembly of the LHC now complete, the paper reviews the work flow, resources, and the qualification results including the different types of electrical non-conformities.
Keywords:
- Correction
- Source
- Cite
- Save
- Machine Reading By IdeaReader
3
References
4
Citations
NaN
KQI