NANOSECOND-TIMESCALE INTRA-BUNCH-TRAIN FEEDBACK FOR THE LINEAR COLLIDER: RESULTS OF THE FONT2 RUN

2005 
We report on experimental results from the December 2003/January 2004 data run of the Feedback On Nanosecond Timescales (FONT) experiment at the Next Linear Collider Test Accelerator at SLAC. We built a second-generation prototype intra-train beam-based feedback system incorporating beam position monitors, fast analogue signal processors, a feedback circuit, fast-risetime amplifiers and stripline kickers. We applied a novel real-time charge-normalization scheme to account for beam current variations along the train. We used the system to correct the position of the 170-nanosecond-long bunchtrain at NLCTA. We achieved a latency of 53 nanoseconds, representing a significant improvement on FONT1 (2002), and providing a demonstration of intra-train feedback for the Linear Collider.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    6
    Citations
    NaN
    KQI
    []