High Flux Isotope Reactor. Quarterly report, April--June 1978
1978
Routine reactor operation with three end-of-cycle shutdowns and two mid-cycle shutdowns resulted in an on-stream time of 88.7%. The outer control plates and the No. 1 ionization chamber were replaced.