The SARAF-LINAC Project Status
2016
SNRC and CEA collaborate to the upgrade of the SARAF accelerator to 5 mA CW 40 MeV deuteron and
proton beams (Phase 2). CEA is in charge of the design, construction and commissioning of the superconducting linac (SARAF-LINAC Project).
This paper presents to the accelerator community the status at March 2016 of the SARAF-LINAC Project.