Purpose: The research aims to design a performance improvement framework for a new model of sports shoes to increase the ramp-up process time. Methodology/Approach: The approach used the problem-solving system of 8 disciplines, Single Minute Exchange Dies, Visual Management, and the Just In Time principle. Findings: By using the methods described above, the research findings will have a positive impact on the company. Model changeover time was reduced from 600 minutes to 102 minutes, and ramp-up time was reduced from 20 days to 2 days. Research Limitation/Implication: The limitation of this study was that only the CK2946 model was still done as a case study. The cost and other inhibiting factors were also not included in the discussion of this rump-up process. Originality/Value of paper: By integrating SMED, Just In Time, visual management, and using 8-Dicipline, the researcher developed a framework for improved performance for ramping up a new model of sports shoes.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    17
    References
    0
    Citations
    NaN
    KQI
    []