Dose level measurements during startup of the second unit of the Paks nuclear power plant

1986 
In September 1983 at the Regional Conference of IRPA results were presented which we obtained during startup of the first unit of the PNPP relating to the dose levels in the controlled area.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []