Insulation design and on-site testing method for a long distance, gas insulated transmission line (GIL)
1998
The actual long distance GIL has more than 1,500 connections on site. Therefore, there is a possibility of particle contamination or a contact defect even with strict quality controls.
Keywords:
- Correction
- Source
- Cite
- Save
- Machine Reading By IdeaReader
12
References
16
Citations
NaN
KQI