Study on monitoring of deep foundation pit with SMW engineering method plus anchor cable retaining structure

2018 
The SMW method has many advantages, such as little influence on the surrounding environment, good watertight performance, wide range of application, short construction period, low cost and so on. In this paper, we chose the SMW engineering method combined with anchor cable to support structure in the second phase deep foundation pit of Jinan LuJinDongCheng as the research object, monitored and analysed the horizontal displacement of the pile top, Peripheral surface subsidence and internal force of the anchor cable in the foundation pit. We also discussed the displacement, internal force of anchor cable and the settlement of surrounding environment in the excavation of foundation pit and in different stages of construction. Conclusion:(1)The maximum horizontal displacement of the retaining structure is closely related to the depth and time of excavation, the construction of anchor cable can well limit the deformation of pile body; (2)Groundwater seepage caused by foundation pit dewatering will change the e...
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    1
    References
    0
    Citations
    NaN
    KQI
    []