Reliability Allocation in Nuclear Power Plants

1985 
The technical feasibility of allocating reliability and risk to reactor systems, subsystems, components, operations, and structures is investigated. A methodology is discussed which identifies top level risk indices as objective functions and plant-specific performance variables as decision variables. These are related by a risk model which includes cost as a top level risk index. A multiobjective optimization procedure is used to find non-inferior solutions in terms of the objective functions and the decision variables. The approach is illustrated for a boiling water reactor plant. The use of the methodology for both operating reactors and for advanced designs is briefly discussed. 16 refs., 1 fig.