Stormwater management at the ARID INEL

1994 
NPDES stormwater permits are required for stormwater discharges to waters of the US (WUS). The Idaho National Engineering Laboratory (INEL) applied for coverage under a general NPDES stormwater permit because there is some potential for stormwater discharge to the Big Lost River System, which could infiltrate to groundwater. The main requirements of the permit are to prevent contaminants from coming into contact with stormwater and prevent contaminated stormwater from running off of facilities into WUS or groundwater. All INEL major facility areas have prepared and implemented stormwater pollution prevention plans (SWPPPs). The INEL also applied for coverage under a separate NPDES general permit for stormwater discharges from construction sites. An INEL Generic SWPPP for construction activities was prepared and implemented for all construction projects at the INEL.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []