On June 8, 1983, a beam consisting of a single S-band bunch was transported through the linac into the beam switchyard (BSY) and analyzed in the C-line (Beamline 27) at 30 GeV. The C-line toroid 2712 measured an intensity of approximately 2 x 10/sup 9/e/sup -//pulse. The exact intensity was uncertain due to the limited response time of the toroid for fast, single-bunch beams. However, the linear Q intensity monitors (Lin Q) showed the transmission of the beam through the linac between Sectors 2 and 30 to be fairly flat with an intensity of 3 x 10/sup 9/e/sup -//pulse in the final 19 sectors. The CID Faraday cup, which is located adjacent to the Gun Lin Q, was used to check the calibration of the Lin Q.