Production plan change-oriented multi-objective constraint material substitution method
2013
The invention discloses a production plan change-oriented multi-objective constraint material substitution method, which comprises the following steps: 1, establishing a material substitution model; 2, establishing a material substitution algorithmic rule; and 3, performing an analysis and decision process of substitute material selection. According to the production plan change-oriented multi-objective constraint material substitution method disclosed by the invention, by aiming at material requirement coordination among a product bill of materials (BOM), a process BOM and a plan BOM, which is involved by the material substitution problem emerging in complex equipment due to a task change during an assembly production process, a multi-constraint and multi-objective-oriented material substitution model is established, and meanwhile, according to different attribute characteristics (a design characteristic, a process characteristic and a plan characteristic) of materials to be used as constrained parameters of material substitution, a substitute algorithm of the selection of different material substitutes so as to realize material section, matching and substitution among products, and therefore, the supply-demand relationship balance between substitute materials and product requirements under the assembly constraint environment of design, the process, the task change and resource capability and the like is guaranteed, on-hand inventory parts or parts expected to arriving in the future are reasonably distributed to meet the kitting requirements, and the goal that the total cost is minimized is achieved.
Keywords:
- Correction
- Source
- Cite
- Save
- Machine Reading By IdeaReader
0
References
0
Citations
NaN
KQI