Test Results of a Nb3Sn Wind/React 'Stress-Managed' BlockDipole

2006 
A second phase of a highfield dipole technology developmenthas been tested. A Nb3Sn block-coil model dipole was fabricated, usingmagnetic mirror geometry and wind/react coil technology. The primaryobjective of this phase was to make a first experimental test of thestress-management strategy pioneered at Texas AM there was no training. Thedecoupling of Lorentz stress between inner and outer windings wasvalidated. In ramp rate studies the magnet exhibited a remarkablerobustness in rapid ramping operation. It reached 85 percent of shortsample(ss) current even while ramping 2-3 T/s. This robustness isattributed to the orientation of the Rutherford cables parallel to thefield in the windings, instead of the transverse orientation thatcharacterizes common dipole designs. Test results are presented and thenext development phase plans are discussed.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []