Wind-fire-water co-scheduling method on basis of multi-agent system
2012
The invention relates to a power scheduling operation method, in particular to a wind-fire-water co-scheduling method on the basis of a multi-agent system. The method solves the problem that a conventional power scheduling operation method cannot meet the requirement on the large-scale wind power grid-connected operation. The wind-fire-water co-scheduling method on the basis of the multi-agent system is implemented by adopting the following steps of: 1, constructing a wind-fire-water co-scheduling model on the basis of the multi-agent in a scheduling Agent; 2, acquiring predicted data of a load demand in a power system by a load Agent in the power system; 3, sending acquired basic data and real-time data into the wind-fire-water co-scheduling model on the basis of the multi-agent by each thermal power Agent; and 4, issuing and executing a scheduling command by each thermal power Agent and a hydroelectric Agent. The wind-fire-water co-scheduling method is suitable for large-scale wind power grid-connected operation scheduling.
Keywords:
- Correction
- Source
- Cite
- Save
- Machine Reading By IdeaReader
0
References
0
Citations
NaN
KQI