Key Planning Questions to Consider in Small Stream Hydrometric Monitoring
2019
This article provides key questions to consider when planning and operating a small stream hydrometric station. Office planning components include defining hydrometric monitoring objectives; the availability of hydrometric expertise; resource availability; safety plans and standard operating procedures; equipment availability (hydrometric station installation and streamflow measurement); sampling frequency and data availability; permissions and permitting requirements; data processing, access, and archiving; and metadata requirements. Key parts of field-based hydrometric planning include site safety; site accessibility; flow variability; channel control features; flow containment, diversions and additions; low flow considerations; high flow considerations; flow measurement challenges in small streams; benchmarks and survey criteria; and public safety and vandalism. Theoverall goal of the article is to help non-professionals collect better hydrometric data and to highlight the varied planning aspects of typical hydrometric installations and operations.
Keywords:
- Correction
- Source
- Cite
- Save
- Machine Reading By IdeaReader
0
References
0
Citations
NaN
KQI