language-icon Old Web
English
Sign In

Construction site hoarding

2012 
The utility model discloses a construction site hoarding. The construction site hoarding is characterized in that each 'H'-shaped steel column is formed by three steel plates by means of welding, sandwich plates are bi-directionally mounted in bilateral grooves of each 'H'-shaped steel column, the bottom of each steel column is fixedly arranged on a steel column base anchor 7 through a bolt, borders are arranged on the periphery of each sandwich plate and are groove-type gusset plates bent by steel plates, a lighting lamp is arranged at the top of each steel column, a circuit routing for arrangement of the lighting lamps is arranged in the top borders of each sandwich plate, diagonal braces are arranged, and one end of each diagonal brace is hinged on the upper portion of each steel column while the other end of each diagonal brace are hinged on a diagonal brace base anchor. The construction site hoarding is firm in structure and capable of guaranteeing using effect and providing support for strengthening civilized construction management and creating civilized city images.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []