Status of the antiproton decelerator: AD

1997 
A simplified scheme for the provision of antiprotons at 100 MeV/c in fast extraction is described. The scheme uses the existing p production target area and the modified Antiproton Collector Ring in their current location. Some modifications necessary to deliver batches of 1 × 10 7 antiprotons every minute at 100 MeV/c are described, details of the machine layout and the experimental area in the existing AAC Hall are given.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    5
    References
    6
    Citations
    NaN
    KQI
    []