TRAINING WORKS CONSTRUCTED IN THE RUPNARAIN RIVER IN BENGAL AFTER MODEL EXPERIMENTS TO PREVENT FURTHER BANK EROSION ENDANGERING THE BENGAL-NAGPUR RAILWAY LINE LINKING CALCUTTA WITH BOMBAY AND MADRAS. MARITIME AND WATERWAYS ENGINEERING DIVISION.

1946 
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    1
    Citations
    NaN
    KQI
    []