The application of module production team in semiconductor test line

2012 
In this paper,taking a certain semiconductor test line as the research object,applying the theory of Gemba Kaizen and PDCA Cycle to optimize the semiconductor test line.Firstly,analyzed the Human-Machine Matching,Time Utilization ratio,Work Loading and Organization Chart,and then put forward module production team.Through these,the productivity was increased by 20.3%.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []