Simplified method for measuring the response time of scram release electromagnet in a nuclear reactor

2015 
Abstract The delay time in electromagnet clutch release during a reactor trip (scram action) is an important safety parameter, having a bearing on the plant safety during various design basis events. Generally, it is measured using current decay characteristics of electromagnet coil and its energising circuit. A simplified method of measuring the same in a Sodium cooled fast reactors (SFR) is proposed in this paper. The method utilises the position data of control rod to estimate the delay time in electromagnet clutch release. A computer based real time measurement system for measuring the electromagnet clutch delay time is developed and qualified for retrofitting in prototype fast breeder reactor. Various stages involved in the development of the system are principle demonstration, experimental verification of hardware capabilities and prototype system testing. Tests on prototype system have demonstrated the satisfactory performance of the system with intended accuracy and repeatability.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    5
    References
    0
    Citations
    NaN
    KQI
    []