Porous pipe method large-diameter high-pressure jet grouting pile construction method

2014 
The invention relates to a porous pipe method large-diameter high-pressure jet grouting pile construction method. A high-pressure water conveying pipe, a high-pressure water compressed air conveying pipe and the like are arranged in a drill rod, the lower part of a drill bit is respectively provided with a high-pressure solidifying liquid and compressed air jet opening, a high-pressure water pipe jet opening and a compressed air water spraying opening, the positions of the high-pressure water pipe jet opening and the compressed air water spraying opening are positioned above the high-pressure solidifying liquid and compressed air jet opening, the bottom of the drill bit is provided with a high-pressure water jet opening, and the high-pressure water conveying pipe downwards jets water flow through the high-pressure water jet opening for cutting, so that the lower side of the drill pipe reaches the design pile bottom elevation, then, high-pressure water jet flow and compressed air jet flow are jetted from the high-pressure water pipe jet opening and the compressed air jet opening, high-pressure solidifying liquid and compressed air jet flow is jetted out from the high-pressure solidifying liquid and compressed air jet opening and is rotationally lifted along with the drill rod, and the peripheral soil bodies are subjected to secondary cutting, so that cement slurry and soil are stirred to be mixed into a pipe. Compared with an ordinary high-pressure jet grouting pile, the porous pipe method large-diameter high-pressure jet grouting pile has the advantage that the integral pile forming efficiency is improved by about 30 percent.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []