Case Studies in Accelerated Practices for Airfield Concrete Pavement Construction

2005 
Case studies have been developed to form the basis for a Guide for Accelerated Practices for Airfield Concrete Pavement Construction for the Innovative Pavement Research Foundation. First, a comprehensive list of accelerated airfield concrete pavement projects was assembled. From this list, a shorter list of detailed case studies was developed. These case studies were developed through site visits and telephone and electronic mail interviews. Techniques that have been used to accelerate concrete airfield pavement construction include the use of high early strength concrete, the temporary use of precast panels, innovative contracting practices, design and construction innovations, and creative planning and phasing solutions. The case studies provide valuable documentation of the lessons learned in the implementation of these strategies. The Guide will be of interest and value to anyone who is contemplating either new portland concrete cement (PCC) pavement construction or the maintenance, rehabilitation, or reconstruction of an existing PCC pavement under operational constraints.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []